J. Campbell Construction Limited installed Kingspan KingZip stucco embossed mill finish aluminium  standing seam insulated roof panels to the roof and Kingspan KS1000LP horizontally laid wall panels to the walls at Bryn-y-Neuadd Hospital at Llanfairfechan in North Wales.

The wall panels were 140mm thick and over 6m long and were lifted into place by a crane using suction lifting equipment. This method of lifting panels into place speeds up installation time and reduces the risk of injury by reducing manual handling

Before the commencement of any work J. Campbell Construction Limited will produce all necessary Risk Assessments and Method Statements in line with HSE (Health & Safety Executive) requirements.

In addition all our personnel hold CSCS (Construction Skills Certificate Scheme) Training Cards as evidence of appropriate training for work on all UK construction sites.

PASMA working with mobile aluminium scaffold towers and IPAF working with MEWP’s (Mobile Elevated Work Platforms ) are training certificates also held by our operatives.